Tuesday 5 September 2017

An army of robots planned, designed, and built this 3-story house from the ground up

TwitterFacebook

This 3D printed construction is on an entirely new level of automation.

The DFAB House in Zurich is designed and built entirely by an army of robots and 3D printers, each working on constructing individual rooms and floors.

The house is scheduled to be completed in 2018. Read more...

More about Robots, Research, 3d Printing, Robotics, and Construction

http://ift.tt/2iZDeLl from Tech http://ift.tt/2wC5fgN
via IFTTT

No comments:

Post a Comment